Verified fact
Official documents, published reports, direct correspondence or clearly evidenced material.
The first Strathbogie Hub feedback deadline has passed. The scrutiny has not, and other consultation windows are now live.
Save the Deveron Valley is building a set of community evidence tools to help residents, land users, local groups, elected representatives, journalists and public bodies understand the wider picture around the proposed Strathbogie Hub and related infrastructure.
These tools are not anti-renewables and not anti-grid.
They are about fair process, proper assessment, clear information and meaningful public participation.
The whole picture should not have to be guessed from fragments.
Please read our Community Code of Conduct before commenting, sharing evidence or contacting public bodies on behalf of the campaign.
These tools are designed to help communities:
We use four simple evidence labels throughout this work.
Official documents, published reports, direct correspondence or clearly evidenced material.
Local testimony, observation or public reports which may still need checking.
Relevant examples from elsewhere which help communities ask better questions, but do not prove the same thing will happen here.
Important matters requiring written clarification from decision-makers, developers or public bodies.
A public credibility page separating confirmed facts, active checks and formal questions.
Tracking the relationship between the Beauly–Blackhillock–New Deer–Peterhead 400kV overhead line and the proposed Strathbogie Hub.
A community-led framework for what should be assessed before any preferred site is selected.
A plain-English guide for responding honestly and usefully when a project is not on your doorstep, but may still be connected to your community through wider infrastructure, cumulative impact or public interest.
Questions on battery storage, private wire, associated development, fire safety, traffic, water, commercial purpose and cumulative impacts.
Calm, practical guidance on how to respond if landowners, occupiers or residents receive survey-related notices or requests.
A plain-English public-interest page asking whether the legal framework is keeping pace with modern energy infrastructure.
Template requests and guidance for seeking recorded information from public authorities.
Ways to support the campaign and help grow the public record.
A plain-English guide to who proposes, examines, advises, regulates and decides.
Test routes, structures, vehicle assumptions and emergency access in real rural conditions.
Notice designated and undesignated heritage, setting, place names and local knowledge.
Follow runoff, groundwater, drainage and private supplies across the whole catchment.
Practical preparation for wildfire, severe weather, power cuts, water interruption and blocked roads.
More downloadable tools are being prepared. The Save the Deveron mailing list and newsletter are also coming soon, but no sign-up form is active yet.
Planned downloads include:
The sign-up form will be added only after consent, confirmation, delivery, privacy and unsubscribe have been fully tested. Until then, use the website, Facebook or Instagram for current public updates.
If you agree that the Deveron Valley deserves fair process, cumulative assessment and meaningful participation, please support and share our petition.
Save the Deveron Valley is asking whether the system delivering this infrastructure is fair, modern, transparent, cumulative, future-proof and worthy of public trust.
The Deveron Valley is a living landscape, not spare land.
Power should serve life. Not the other way round.