1. Strategic dependency
We are asking whether the OHL or Shetland 2 system creates the case for the Hub, strengthens the case for the Hub, relies on the Hub, or interacts with the Hub’s timing, routeing or site selection.
If the foundation stone is still under public scrutiny, the next layer should not be treated as inevitable.
Save the Deveron Valley is examining whether the proposed Beauly–Blackhillock–New Deer–Peterhead 400kV overhead line, the Shetland HVDC Link 2 system and the proposed Strathbogie Hub are being treated through separate processes while communities may experience them as one connected infrastructure system.
We are not assuming dependency as a proven fact. We are saying it must be properly clarified.
If the proposed Strathbogie Hub depends on, connects to, is justified by, or is materially affected by the Beauly–Peterhead OHL or wider Shetland 2 system, then the Hub cannot be treated only as a standalone local siting issue.
No preferred Strathbogie Hub site should be selected until the status and implications of its dependent infrastructure are clear.
This page exists because communities need answers to questions such as:
We are asking whether the OHL or Shetland 2 system creates the case for the Hub, strengthens the case for the Hub, relies on the Hub, or interacts with the Hub’s timing, routeing or site selection.
A major concern is whether affected communities are visible enough in assessment documents to count as affected, but not visible enough in practice to receive clear local consultation access.
We are reviewing material relating to landscape and visual effects, B9022 road users, River Deveron catchment issues, construction traffic and cumulative local burden.
If developer forums or similar coordination routes exist for project and asset interests, communities should not be left trying to reconstruct the same picture from scattered fragments.
If major connected infrastructure remains under scrutiny, then linked local site-selection decisions should not harden prematurely.
Shetland 2: SSEN is holding events in Whitehills and Banff and has opened written feedback. Use the Updates page for the current dates, venues and direct route.
OHL process: the Beauly–Peterhead OHL remains in the DPEA inquiry process. The public case register now includes detailed material and requests concerning Raeshaw/workers accommodation and agricultural operations.
Anyone corresponding about the OHL should quote TRL-270-2 / ECU00005165, follow the current procedural notice and avoid treating a request or question from DPEA as a finding against any party.
If you have official documents, local notices, consultation materials, maps, correspondence, photographs or firsthand local knowledge, please email the campaign.
Mailing list and newsletter coming soon. No sign-up form is active yet; it will be added only after the full consent, confirmation, privacy and unsubscribe journey has been tested.
If you agree that the Deveron Valley deserves fair process, cumulative assessment, transparent site selection and meaningful participation, please support and share our petition.
If the energy transition is to keep public trust, communities must be given a fair, joined-up and intelligible account of what is being proposed, why it is being proposed, and how connected projects relate to one another.
Public trust is infrastructure.